This is a heading
This is a subheading 123
this is some text which will go here
If a local authority is satisfied that they need take action due to a breach of the Housing Health and Safety Rating System (HHSRS), they have a number of different options at their disposal, including compelling the landlord to improve the property via an improvement notice or doing the work themselves where emergency remedial action is required. The options available will vary depending on the severity of the hazards.
This guidance is designed to provide a short summary of the options available, what they mean and when they may be used.
The Renters' Rights Bill, the most significant set of changes to the PRS in over 30 years, completed its passage through parliament on 27th October 2025 and is now the Renters' Rights Act.
The legislation doesn't apply to your tenancies yet though. The legislation will not come into force until 1 May 2026. From that date, the Act will:
The rest of the of the Renters' Rights Act, including the private rented database and the Decent Homes Standard, will follow at a later date.
The advice and resources on this page is currently accurate but will be outdated on 1 May 2026.
The NRLA is currently preparing a suite of replacement guides and tenancy documents to help you manage the transition smoothly.
For further information on the Renters' Rights Act and its details, please see our dedicated Renters' Rights hub.
Local authorities have a number of enforcement tools available to them if they believe the property is hazardous.
The most commonly used option is the hazard awareness notice. This is an advisory notice alerting the owner of the property to the existence of category 1 and 2 hazards in the property. It cannot compel you to do the recommended works to the property.
Hazard awareness and improvement notices look very similar; both provide details on category 1 and 2 hazards in the property and steps to take that can rectify or minimise them.
However, the hazard awareness notice is an advisory notice meaning that you cannot be compelled to improve the property when you receive this notice. As a result, there will be no specific timeframes for making improvements. While this notice is advisory, it should be noted that local authorities are likely to inspect again at a later date. As hazard awareness notices do not prevent further enforcement action, the local authority is free to take further action to seek improvements.
A hazard awareness notice is likely to be the first enforcement step in the event of hazards in the property. For more serious category 1 hazards the local authority are likely to skip it entirely and move on to the notices with enforcement powers.
An improvement notice compels the person the notice is served on to carry out work to remove or reduce a hazard. Typically the person it will be served on initially is the person in control of the property. Copies informing the tenants and potentially also the landlord (if an agent controls the property) will also be sent out.
The notice will set out:
In England, if an improvement notice is served it is not possible to serve a Section 21 notice for six months afterwards.
It is an offence to not comply with an improvement notice. Further enforcement action that can be taken includes:
Appeals against the improvement notice can be made to the First Tier Tribunal (Property Chambers) within 21 days of the notice being served. While the appeal is ongoing the improvement notice is suspended.
If the hazards have been addressed before the appeal is heard the improvement notice should be quashed, restoring Section 21 notice rights.
A prohibition order may be used in relation to a category 1 or 2 hazard. It prohibits the use of a property, or a part of the property. This prohibition may apply to everyone or it may specify a particular group that are prohibited from occupying the property. This takes effect 28 days after the order is given.
The order must contain:
An order must be revoked once the hazard that led to its issuance has been eliminated.
In general prohibition orders are expected to be used where:
Local authorities may take emergency remedial action or make an emergency prohibition order in certain circumstances:
Where the local authority does take emergency remedial action they will perform any works necessary to fix the hazard. A notice will then be served within 7 days stating:
The emergency prohibition order works in much the same way as the ordinary prohibition order except that it takes effect on the same day it is served.
Rarely used but available in situations where there is a sufficiently serious category 1 hazard, a demolition order can require the owner to demolish the property. Tenants may be entitled to compensation and accommodation from the local authority in such situations.
A demolition order can also be used by local authorities as a way to gain possession of the property.
Given the seriousness of this, if you are served with a demolition order you should seek legal advice as soon as possible.